Quality

What We Check Before a Hanger Ships

A hanger fails at the joint, the clip or the finish — rarely in the photo. These are the checks we run, and the ones we will put in writing.

  • MoistureWood stability
  • Joint loadBar & clip
  • Colour matchBatch sample
  • Logo checkPosition & depth

The problem

Three failures account for most returns

Inspection covers wood moisture, bar joint load, clip tension, finish and colour match against the approved sample, and logo position and depth — against written acceptance criteria.

A bar joint that lets go under a folded trouser. A clip that loses tension after a season. A batch that does not match the one before it.

Each is a specification problem before it is a production problem — so each is written into the order before the line starts, and checked against a physical sample rather than a photograph. A batch that does not match the sample does not ship. How each specification is written is covered in the specification guide.

Acceptance

What the batch must pass

CheckCriterionWhen
Wood moistureDried and stable before finishing; no movement after paintingBefore finishing
Bar jointReinforced joint; holds a folded trouser without deflectionOn the line
Clip tensionAdjustable spring; pad protects silk and fine woolOn the line
ColourMatched to the approved batch sample, not a screenBefore cartoning
LogoPosition, depth and alignment against the vector proofBefore cartoning
PackingCarton count and labelling per room block or SKUBefore palletising

Process

How inspection runs

01

On the line

Joint and clip checks run as pieces are assembled, not only at the end.

02

Before cartoning

Colour, logo depth and finish compared with the retained approval sample.

03

Retained sample

The approved sample and batch record stay on file, so a reorder is measured against the same standard.

On the floor

Where the checks happen

Failure

What happens when a batch fails

It does not ship. The failure is traced to the step that caused it — pressing, finishing, logo or packing — corrected, and the batch re-inspected against the same approved sample. If the failure is in the specification rather than the production, we say so before the next run.

In practice

The joint is set at pressing, so it is checked there

A bar joint is formed when the body is pressed, not when it is assembled. When a joint fails, that lets us trace the problem to a press run and a batch instead of inspecting an entire shipment for a fault that started upstream.

Have a specification to check against these criteria? Get a written quotation →

FAQ

Quality questions

Can I approve a sample before production?
Yes — a pre-production sample against approved artwork, shipped before the bulk run.
Who inspects?
Our quality team inspects on the line and again before cartoning. If your own team or an agent will inspect before shipment, tell us early so the line and the packing date can be scheduled around it.
What happens if a batch fails?
It does not ship. The failure is corrected and the batch re-inspected against the same sample.
Can I see the acceptance criteria first?
Yes — the written criteria for your product line are available before the first order, so they can go into a tender. Customisation limits are on the customisation page.
Do you keep samples for comparison?
The approved sample and the batch record are retained, so a later order is measured against the original rather than a new one.

Reviewed by the specification team · Updated November 2026

Request a Custom Wooden Hanger Quotation

Five fields are enough for a written quotation: who you are, where to reply, which line, and what the project needs.

WhatsApp

No account is created and nothing is stored on this site — the form opens your email app or WhatsApp with the details filled in.

WhatsApp +86 135 2785 6939 · WeChat lukefde · [email protected]

Chat with us